EN · PL Call 07783 200068
Home › Consumer unit replacement

Consumer unit replacement in Ealing

New 18th Edition fuse boards with RCD or RCBO protection, tested, certified and notified, usually in one day.

  • Sebastian, JIB Approved Electrician
  • 18th Edition BS 7671 qualified
  • Inspection and testing qualified
  • NAPIT registered
  • Public liability insured

When to replace your consumer unit

  • It has old rewireable fuses or no RCD protection
  • It has a wooden back, a plastic case, or signs of heat damage (new boards in homes must be non-combustible)
  • An EICR has recorded C2 items against it
  • You are adding circuits, an EV charger, solar panels or a battery
  • It keeps tripping and the fault is in the board itself

What is included

  • A new metal-clad board to the 18th Edition of BS 7671
  • Testing of every circuit before and after the change
  • An Electrical Installation Certificate and Building Regulations notification
  • Usually done in one day, with the power off for most of it

Consumer unit replacement

from £780
  • Dual RCD board, up to 10 ways: £780
  • RCBO board with surge protection: £950
  • 12–16 ways or moving the board: from £1,100
Get a consumer unit quote

RCD or RCBO?

A dual RCD board splits your circuits into two groups, so one fault can switch off half the house. An RCBO board protects every circuit on its own, so a fault switches off only that circuit. RCBO boards cost more but are better for rentals, home offices and anything with a freezer or medical equipment.

Consumer unit questions

How much does a new consumer unit cost in Ealing?

£780 for a dual RCD board up to 10 ways, £950 for an RCBO board with surge protection, and from £1,100 for larger boards or moving it.

How long does a consumer unit change take?

Usually one day. The power is off for most of the job.

Do I need Building Regulations approval?

Replacing a consumer unit is notifiable work. We provide the Electrical Installation Certificate and the Building Regulations notification.

Will my old circuits pass?

We test every circuit first. If a circuit has a fault, we tell you and quote the repair before fitting the new board.

Get a quote

Tell us about the job and we reply the same working day with a price. Fixed-price jobs like EICRs get a firm price straight away.

Sending opens your email app with your details filled in. We use them only to reply to you. Privacy notice.

CallWhatsAppGet a quote